Flip 360 Commission Platform
INTERNAL PMO PAPER  ·  Confidential — for Steerco distribution only  ·  Tabled at SC#3 (2026-07-06) for ratification  ·  Prepared 2026-07-04 by Ms Oliver (Chair, PMO Director)
PMO Backlog Register  ·  Sprint AC-onward

Tech + Investor Relations Backlog — Seven Epics for SC#3 Ratification

This is the governance spine for the seven outcomes the Chair (Ms Oliver) requested on 2026-07-04. Each epic maps to a Steerco decision (D110 tech ownership; D116 CRM scope), attributes Mr Punter’s originating ideas (CM postcode territory, community-earnings redistribution) verbatim, and slots into the standing sprint discipline. AU-first base case; NZ Phase 3 expansion optionality with forward-looking labels on every un-sourced number. Ratification at SC#3 (2026-07-06) converts each epic into a scoped sprint delivery under the standing three-destination discipline.
Total epics
8
Proposed
0
Delivered
8
New RAID rows
5
Strategic frame — AU-first, NZ-expansion

Epic Index

EPIC-01 · Sprint AC-2
Investor Brief v2.0 — AU-First Base Case + NZ Expansion Optionality + Live Sensitivity Sandbox
WS7 · Investor Relations Delivered
A production investor pitch surface, live at cosaiflip360.org, that Mr Punter can present in an AU or NZ investor room with (a) narrative deck against the v1.2 model, (b) live 4-slider sensitivity sandbox, (c) unit econo…
EPIC-02 · Sprint AC-late
Onboarding Wizard — Guided Provider Signup Flow (Mr Punter’s Design)
WS2 · Tech (Commission Engine + CRM) Delivered
A production onboarding wizard, live at cosaiflip360.org/onboarding (or similar), that a new provider walks through in under 8 minutes. Provider emerges as a live record in the CRM, with profession assigned, CM territory…
◆ Mr Punter’s originating idea — attribution intact
EPIC-03 · Sprint AC-early + AC-late
CRM Consent-to-Refer — EA Rule 4 Implementation
WS2 · Tech (Commission Engine + CRM) Delivered
Every referral originated through the Flip360 CRM carries a cryptographically-timestamped consent record from the person whose details are being passed. The consent is captured through a Sally-shaped flow (SMS/email prom…
◆ Mr Punter’s originating idea — attribution intact
EPIC-04 · Sprint AC-early + AC-late
CRM Go-Live Slice 1 — CM Recruitment for Mr Punter
WS2 · Tech (Commission Engine + CRM) Delivered
Mr Punter can, on the Monday after SC#3 ratification, log into cosaiflip360.org, bulk-load a CSV of his financial-services provider contacts, receive AI-agent-drafted invitation email templates per recipient (personalise…
◆ Mr Punter’s originating idea — attribution intact
EPIC-05 · Sprint AB-tail-2
PMO Flying-Minutes Register — Steerco Meeting Documentation
WS2 · Tech (Commission Engine + CRM) Delivered
Live at cosaiflip360.org/engagement/pmo/minutes/2026-07-04. 13 agenda items, full attribution boxes for Mr Punter’s two originating ideas, confidentiality banner (INTERNAL STEERCO PAPER), sign-off block, ratification pat…
EPIC-06 · Sprint AC-2 (Path C)
Status Report — Tech Workstream (WS2) — CRM + Onboarding Wizard
WS2 · Tech (Commission Engine + CRM) Delivered
A production status report surface at /engagement/pmo/ws-status/ws2-2026-07-13 (SC#3 cycle week 1 snapshot) that Ms Oliver can share with the Steerco. Shows: sprint AD burn-down (EPIC-03 + EPIC-04), sprint AE burn-down (…
EPIC-07 · Sprint AC-2 (Path C)
Status Report — Investor Relations Workstream (WS7) — v2.0 Brief + Sandbox + AU/NZ Framing
WS7 · Investor Relations Delivered
A production status report surface at /engagement/pmo/ws-status/ws7-2026-07-13 that Ms Oliver + Mr Punter can share with the Steerco. Shows: new investor brief metrics (route hits, sandbox interactions if instrumented), …
EPIC-08 · Sprint AD-1
Sprint AD-1: Domain-bound Matt release + Carla approval workflow + .com retirement
WS2 · Tech (Commission Engine + CRM) Delivered
Three purpose-scoped .org domains bound to the Cloudflare Pages project with host-scoping middleware enforcing path allow-lists per scope; .com domains retired; magic-link email fallbacks fixed to .org so 06 Jul CRM laun…

Sprint Plan (Sprint AC-onward)

Sprint Window Focus Epics WS
AC-1 2026-07-07 → 2026-07-13 NZ market sourcing research EPIC-01a WS7
AD 2026-07-14 → 2026-07-24 CRM go-live slice 1 for CM recruitment + Rule 4 consent scaffolding EPIC-03, EPIC-04 WS2
AC-2 2026-07-27 → 2026-08-06 (serialised after AD per D-SEQ-02) Investor Brief v2.0 build + live sensitivity sandbox + unit economics + NZ optionality EPIC-01b, EPIC-01c, EPIC-01d, EPIC-01e WS7
AE-buffer 2026-08-07 → 2026-08-09 EPIC-04 prod stabilisation with Mr Punter — no new scope EPIC-04 (stabilisation) WS2
AE 2026-08-10 → 2026-08-20 Onboarding wizard (depends on EPIC-04 stable in prod) EPIC-02 WS2
Standing Every Monday post-Steerco (07-13, 07-27, 08-10, 08-24) Status snapshots — WS2 (EPIC-06) + WS7 (EPIC-07). Cadenced WoW output, not sprint scope (D-SEQ-04). EPIC-06, EPIC-07 Cross

New RAID Rows (Tabled at SC#3 for RAID_LOG Entry)

R-NZ-01 Amber · Risk WS7
NZ market numbers modelled at 18% of AU proxy, not regulator-sourced — hazard of an NZ investor challenging the number in the room
Owner: Mr Punter (IR voice) · Ms Oliver (CFO accountable)
Mitigation: Every NZ number in the investor brief labelled "Forward-Looking - Sourced Estimate". Sprint AC-1 source-hardening committed to SC#3 as a ratified sub-epic (EPIC-01a). NZ regulators identified (FMA, FSPR, REINZ, IAA, Charities Services). Until AC-1 ships, Mr Punter presents NZ as expansion optionality, not base-case revenue.
R-NZ-02 Amber · Risk WS4
Foundation architecture is ACNC-registered (AU only); no NZ Charities Services arm exists — Phase 3 launch blocked without WS4 counsel scope
Owner: Ms Oliver (WS4 PMO oversight until counsel engaged) · counsel TBA per D102
Mitigation: NZ Foundation arm flagged as WS4 counsel scope for Phase 3 pre-work. Not represented as operational in Phase 1-2. EPIC-01e (NZ optionality section) explicitly states "structural work required prior to NZ launch — WS4 counsel scope" so investors are not misled. Cross-Tasman DGR recognition status to be researched in AC-1.
R-NZ-03 Green · Assumption WS7
FX rate for AUD/NZD sourced from RBNZ published rate, refreshed at each Steerco
Owner: Ms Oliver (CFO accountable)
Mitigation: RBNZ published rate visible on all NZD figures in investor brief with source + date. Refresh cadence = each Steerco (bi-weekly). If AUD/NZD moves more than 3% between Steercos, ad-hoc refresh triggered and re-render committed.
R-SANDBOX-01 Amber · Risk WS7
Investor anchoring bias hazard on live sensitivity sandbox — investor could drag community give-back slider to 20% and demand Mr Punter commit at that level
Owner: Mr Punter (IR voice) · Ms Oliver (CFO/PMO accountable)
Mitigation: Sandbox community-give-back slider carries a visible anchor line at 50% with footnote: "Founder-set baseline per Mr Punter’s originating design and Vol 5 v1.1 Chapter 4.5 ratification; sliders permit sensitivity analysis, base case is anchored." Mr Punter’s room-script includes the Rule 1 court-defensibility framing: "we’ve ratified this with counsel; sensitivity is illustrative not negotiable". WS7 briefing pack contains the sandbox operator guide.
R-SANDBOX-02 Amber · Risk WS7
Sandbox numbers must reconcile to IM headline — if slider defaults produce FY31 revenue other than $42M, investor loses trust
Owner: Ms Oliver (WS7 accountable)
Mitigation: Default slider positions produce IM headline figures exactly ($240k FY27 → $42M FY31 at 3% SOM base case, 15% platform take, 50% Foundation split, AUD, AU-only geography). Regression test in Sprint AC-2 acceptance: sandbox on load must render the four IM anchor numbers before ship. Formula visible on hover per Rule 3 evidence pack discipline.

Ratification Path

Prepared: 2026-07-04, Ms Oliver (Chair, PMO Director)  ·  Attribution intact per flying-minutes 2026-07-04  ·  No forward-fixing. Additive discipline.
Matt's page